Grays Mining is selling this:

Category
Processing Plant
Location
Australia: New Zealand
Earnscleugh, Otago, New Zealand 
Condition
Used 
Price
Price on Request

Description

Project Completion Disposal Sale - Alluvial Gold Processing Plant
List of major plant and pumping components
• JCI 20/ 8 flat 2 deck primary scalping screen capable of 700t/hr.
• Sanvik SP1623 pan feeder capable of 750t/hr.
• Warman 10/8 primary sand pump, used hoses and fittings
• Warman 8/6 tailings sand pump, used hoses and fittings
• Warman 4/3 secondary sand pump, used hoses and fittings
• Warman 4/3 recovery sand pump, used hoses and fittings
• Warman 660CS dewatering cyclone
• On-board electrical switchboard, variable speed drives, soft starters, electric motors and cabling
• 2 x Indeng hutch pump 500kpa high pressure pumps
• 2 x Southern cross wash water pumps
• 3 x IPJ Inline pressure jigs Cable of processing 100T/hr.
• 2 x ISP30 inline spinner bowls capable of processing 50 T/hr.
• 17 plant pontoons in different configurations to make up plant
• Hydraulic power pack, plumbing, controls, 4x plant mooring winches and winch cables
• Caterpillar 1360kva generator (currently dismantled for an overhaul and awaiting a rebuild to as-new specifications ie new life); housed in portable 40’ container (Generator power supply option!)
• Caterpillar 3306 150kva maintenance generator
• Stacker capable of moving 500T/hr, including used 1200mm wide conveyor belt.
• Walkways, ladders, handrails, framing and cladding, as plant currently configured
• Assorted spares for the above plant components
Optional Extras to the Gold Plant, if required
1. HV Power Supply system to Gold Plant
• Cable realer, handles ~300m of 2-15kv 35mm2 trailing/reeling cable, to 425V
• Transformer XPC 750 kva (location on plant)
• Earth monitoring gear, recloser, metering and ring main unit mounted on mobile “skid”
• Rheyfirm 2- 15kv 35mmcable 250m, if required, including cable floats/buoys to enhance HV supply flexibility
• Rheyfirm type 409 cable 1.1 – 22kv cable 250m this cable is a larger cable; 150mm2 rather than 35mm2
2. Dewatering Pump System
• Two Sykes VSD controlled dewatering pumps, pontoon-mounted
• 1x Caterpillar 275kva generator to power the above dewatering pumps, if generator power supply chosen
• Transformer XPC 300 Kva (mounted on “skid”, running power to dewatering pump)
Contact: Chris Martin
Graysmining.com
Chris.martin@grays.com.au
+61 413627712